 |
| الكاتب | ارسال |
|---|
lili Member

| تاريخ الالتحاق: | الثلاثا أوكتوبر 28th, 2008 |
| الموقع: | LA, California USA |
| عدد المواضيع: | 46 |
| Exams Taken: | SP | | Exams Passed: | | | Describes Me: | |
| Status: |
Offline
|
| مستوى: |     |
|
كتب: الاثنين نوفمبر 17th, 2008 06:45 am |
|
| It took 1hr. Please comment. Thanks صورة مرفقة (شوهد 63 times):

|
lug-nut Architect

| تاريخ الالتحاق: | الاثنين أوكتوبر 2nd, 2006 |
| الموقع: | Black, Unmarked Helicopter |
| عدد المواضيع: | 13312 |
| Exams Taken: | PD, GS, LF, ME, BD/MM, CD, SP, BP, BT | | Exams Passed: | PD, GS, LF, ME, BD/MM, CD, SP, BP, BT | | Describes Me: | private messages disabled. |
| Status: |
Offline
|
| مستوى: |     |
|
كتب: الاثنين نوفمبر 17th, 2008 12:15 pm |
|
Only one sidewalk from PP to the public sidewalk is required.
D trees are not in the program.
C trees at the south end of the parking area serve no purpose.
The SE part of PP has no winter wind protection.
The sidewalk running along the east edge of PP is redundant….minimize paving.
|
lili Member

| تاريخ الالتحاق: | الثلاثا أوكتوبر 28th, 2008 |
| الموقع: | LA, California USA |
| عدد المواضيع: | 46 |
| Exams Taken: | SP | | Exams Passed: | | | Describes Me: | |
| Status: |
Offline
|
| مستوى: |     |
|
كتب: الاثنين نوفمبر 17th, 2008 08:10 pm |
|
| Thanks. You are absolutely right about PP wind protection and the sidewalk on the east of PP. I need more attention and practice. I appreciate your comments.
|
Roman Red Member

| تاريخ الالتحاق: | الاثنين سيبتمبر 29th, 2008 |
| الموقع: | Georgia USA |
| عدد المواضيع: | 55 |
| Exams Taken: | PD, GS, LF, CD | | Exams Passed: | PD, GS, LF, ME, BD/MM, CD, SP, BT | | Describes Me: | 6 down in 3 months and 1 to go! |
| Status: |
Offline
|
| مستوى: |     |
|
كتب: الاثنين نوفمبر 17th, 2008 09:02 pm |
|
Lili,
I agree with lug nuts comments, and would just add that you should keep some distance between the edge of the parking places and your driveway.
I have included a link to some videos that are very helpful in talking about drawing parking places. They also discuss prevailing winds, and a good way to go about testing your wind breaks.
Here is the link: http://www.areforum.org/guest/Site%20Planning/SP%20Videos/
Specifically check out SD Parking pt 1,2, and 3 as well as Site Design part 2.
Also for organizing check out Dan's comments. These help you keep you head straight.
Here is the link:http://www.areforum.org/guest/Site%20Planning/Dan%92s%20Helpful%20SP%20Hints.pdf
Good Luck,
RR
|
lili Member

| تاريخ الالتحاق: | الثلاثا أوكتوبر 28th, 2008 |
| الموقع: | LA, California USA |
| عدد المواضيع: | 46 |
| Exams Taken: | SP | | Exams Passed: | | | Describes Me: | |
| Status: |
Offline
|
| مستوى: |     |
|
كتب: الثلاثا نوفمبر 18th, 2008 06:08 am |
|
Roman Red,thanks for the comments.
I want to buy and evaluate NALSA version of SD and SG. I’ll share my report, mistakes with you. It will be next week. I hope, it isn't too late.
|
Roman Red Member

| تاريخ الالتحاق: | الاثنين سيبتمبر 29th, 2008 |
| الموقع: | Georgia USA |
| عدد المواضيع: | 55 |
| Exams Taken: | PD, GS, LF, CD | | Exams Passed: | PD, GS, LF, ME, BD/MM, CD, SP, BT | | Describes Me: | 6 down in 3 months and 1 to go! |
| Status: |
Offline
|
| مستوى: |     |
|
كتب: الثلاثا نوفمبر 18th, 2008 02:18 pm |
|
Lili,
I'm planning on taking SPD on the Monday Nov 24th, but no biggie if you don't get your reports back by then, I appreciate the gesture anyway.
Thanks,
RR
|
 الوقت الحالي هو 11:39 pm | |
|
|
 |
|